(4) Yes, the available detours for traffic were considered to be acceptable outside peak periods and had been used throughout the construction stages of the Parkway project.

(5) Variable message signs were installed along the main roads entering the Parkway to advise road users of the event and associated traffic arrangements. A media statement and social media posts were used to advise motorists. The matter was also heavily covered on local radio channels.

(6) No formal assessment was undertaken however the road was reopened as soon as it was safe to do so. The road closure was in place from 9.45 am – 3 pm.

(7) $23,400.

Land—rent block surrenders
(Question No 752)

Mr Coe asked the Minister for Urban Renewal, upon notice, on 5 May 2016:

How many land rent blocks have been surrendered to the LDA since 1 January 2015 and what is the (a) block and section and (b) date of surrender for the blocks.

Mr Barr: The answer to the member’s question is as follows:

Two land rent blocks have been surrendered to the LDA between 1 January 2015 and 5 May 2016.

Block 7 Section 53 Bonner and Block 6 Section 42 Bonner were both surrendered on 23 March 2015.

Capital Metro—costs
(Question No 754)

Mr Coe asked the Minister for Capital Metro, upon notice, on 5 May 2016:

What is the expected cost of compiling submissions to the National Capital Authority in regards to Capital Metro Stage 1 and is this figure part of the Capital Metro Agency’s budget for 2015 16 or 2016 17; if not, from which Directorate will the cost of compiling submissions be met.

Mr Corbell: The answer to the member’s question is as follows:

Costs of compiling submissions to the National Capital Authority (NCA) for Works Approval (WA) applications for Capital Metro Stage 1 is included within the Capital Metro Agency’s (CMA) 2015 16 budget and 2016-17 budget estimates as Capital Metro – Procurement and Delivery.

To date, the cost of lodging applications for WA for the Capital Metro project has been $138,710.