Page 3320 - Week 07 - Thursday, 1 July 2010

Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video


(1) $240,000 for signs installed on community paths.

(2) The design and planning of this program commenced in late 2008 and is expected to be completed in 2010-11.

(3) The cost associated with the installation of signs varies from around $320 for a simple community path sign to some $350 to $488 for directional signs.

(4) The installation of signs is in accordance with the TAMS Design Standard for Urban Infrastructure – 13 Pedestrian and Cycling Facilities. The final selection of the location of the signs was a result of stakeholder consultation with the ACT Bicycle Advisory Group.

(5) A total of some 496 signs will be erected during the three year period 2008-11. The vast majority of these have been installed on existing community paths with the exception of twelve signs installed on the new Cotter Road Cycle Path.

Signs installation breakdown on new and existing cyclepaths:

a) 2008 – Nil

b) 2009 – 417

c) 2010 – 79

In addition to these signs, it is also proposed to install sign posting around the four lakes, Lake Burley Griffin, Ginninderra, Tuggeranong and Yerrabi Pond. These signs and associated infrastructure such as seats and path modifications will generally be more substantial and the design of these are currently under development.


Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video