Mr Cornwell = asked the Minister for Urban Services: . In relation to Purchase reference 014270 (Gazette No 19, 12 May 1993)

(1) How many (a) bus stops and shelters and (b) concrete pads and toilet block; were supplied and installed for $176,766.00

(2)What were the basic dimensions of the toilet blocks and what basic areas were

contained in them (eg gender segregated-areas . comprising how many toilets .

and how much wash space etc-).

(3) Where were the toilet blocks installed.

Mr Connolly- the answer.. to the Members question is as follows:

(1) (a) .16 aluminium shelters are to be supplied and installed and 10 concrete bus . shelters are to be relocated. (b) 27 concrete pads are to be constructed and 2 shelier/toilet blocks are to be relocated.

(2) 2 terminus facilities are to be relocated under this contract to meet new bus . .

. route arrangements. - A single toilet with wash basin in an area approximately

-. 2.4 x 1.2 metres is at the end of each of these shelterunits and is for bus.driver use only:

. (3) The locations of these units ate Block 1 Section 57 (Lambda Street) Farrer . . and Section 33.(Basedow Street) Torrens.

2118